HomeNewsSingle lane closures on Roosevelt Boulevard through May

Single lane closures on Roosevelt Boulevard through May

Lanes will be closed to install Americans with Disabilities Act curb ramps.

Roosevelt Boulevard motorists will encounter single lane closures in the inner and outer lanes at the Grant Avenue and Red Lion Road intersections, from 9 a.m. to 3 p.m. through the end of May, for Americans with Disabilities Act curb ramp installations.

In addition, periodic right lane closures are planned on Grant Avenue and Red Lion Road at the Boulevard.

- Advertisement -

The work is part of the city’s Boulevard Direct project, which included construction of new bus shelters, plazas and sidewalks along the U.S. 1 corridor at the intersections of Cottman Avenue, Rhawn Street, Welsh Road, Grant Avenue and Red Lion Road.

A.P. Construction Inc., of Blackwood, New Jersey, is the general contractor on the $2,444,263 million project, which is financed with federal and local funds.

For more information, visit penndot.gov ••

RELATED ARTICLES
Philadelphia
broken clouds
68.6 ° F
72.4 °
63.6 °
77 %
1.3mph
75 %
Mon
85 °
Tue
84 °
Wed
78 °
Thu
78 °
Fri
69 °
- Advertisment -

STAY CONNECTED

11,235FansLike
2,089FollowersFollow

Recent Articles

A reason to celebrate during Donate Life Month

Somerton’s Joe DeMayo described it as “surreal” that he was standing on the Citizens Bank Park field on April 11 ready to catch the...